CD1 Eectric Wire Rope Hoist which have the advantages of light weight, small size, compact structure, varieties specifications, smooth operation and so on. They can be done in the same plane straight, curved, circular of overhead track, you can also track with electric single beam of grain, manual single beam, bridge, suspension, cantilever, gantry cranes and other use .
CD1 Eectric Wire Rope Hoist is widely used in factories, warehouses, docks, power plants, sawmill and other occasions, is an ideal equipment of lifting moving goods .
Operating condition:
Environment temperature:-20℃~+40℃
Operating system: Intermediate JC25% heavy grade: JC40% when intermediate working system, electric hoist lifting capacity reduced by 30% will be seen the heavy duty electric hoist JC40%.
Class: M3 CD1 Eectric Wire Rope Hoist --main structure: reducer, running organizations, roller equipment, hook devices, couplings, flexible cable current into the device and stopper. Motor is with cone rotor motors, set the power and braking force in one.
CD1 Eectric Wire Rope Hoist hoist installation: single beam, bridge cranes, gantry cranes, suspension cranes. Take a little change,can also be used as a winch, so it is the necessary machine to improve working efficiency and conditions.
Model |
0.25TON |
0.5TON |
1TON |
2TON |
3TON |
5TON |
10TON |
Lifting capacity(t) |
0.25 |
0.5 |
1 |
2 |
3 |
5 |
10 |
Lifting height(m) |
3-9 |
6-12 |
6-30 |
6-30 |
6-30 |
6-30 |
6-30 |
Lifting speed m/min |
8(8/0.8) |
8(8/0.8) |
8(8/0.8) |
8(8/0.8) |
8(8/0.8) |
8(8/0.8) |
7(7/0.7) |
Running speed(m/min) |
20(30) |
||||||
Rope size |
6×19-3.6 |
6×37-4.8-180 |
6×37-7.4-180 |
6×37-11-155 |
6×37-13-170 |
6×37-15-200 |
6×37-15-200 |
Rail beam |
16-22b |
16-28b |
16-28b |
20a-32c |
20a-32c |
25a-63c |
28a-63c |
Min.radius of ring rail (m) |
0.8 |
1.5 |
1.5-4 |
2-4 |
2-4 |
2.5-5 |
3.5-9 |
Voltage (v) |
380 |
380 |
380 |
380 |
380 |
380 |
380 |
Frequency (hz) |
50 |
50 |
50 |
50 |
50 |
50 |
50 |
Phase |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
Your Name
E-Mail Address