There are two methods for installing scraper winches: temporary and long-term. China Coal Group professional to tell you what is the specific installation method?

Temporary installation can use pillars to support the top column or add steel tie rods. Long-term installation must use concrete for foundation. The depth of the foundation depends on the soil conditions of the installation, at least 500mm. If reinstalling the brake band, it should be noted that when the handlebar is loosened, there is a proper gap between the brake band and the brake wheel to avoid overheating and excessive wear. After the installation is complete, check whether each fixed connection is firm and reliable. Rotate the reel by hand for 2 ~ 3 turns, it can be connected and driven after being flexible and without blocking.

Precautions for use of scraper winch

Read the "Instruction Manual" carefully before use; The length of the wire rope should be such that when the harrow is at the end position, the wire rope on the drum should be no less than 3 turns; the shield of the winch should be kept intact to prevent sand and stones The ore particles enter the machine and accelerate the wear of the parts;

After the motor is started, it is strictly forbidden to press both control handles at the same time. Always check the lubrication parts. If there is oil leakage or oil shortage, repair and replenish it in a timely manner. When the winch works normally from 1300 to 1600, it should be repaired once. Do not exceed the rim. The scraper winch has been lubricated before leaving the factory. No refill is required before use. After 120 hours of normal operation, the lubricating oil is replaced once.